Darwin's Rydges Resort underwent a major expansion and SAGE manufactured the critical power distribution boards...
To support the Australian Government Petrol Sniffing Prevention Program, a bulk storage tank for low aromatic fuel (LAF) was required to support fuel distribution across the Northern Territory.

AGL Energy’s critical protection panels were upgraded with fault free testing, no downtime...

Australia's primary research organisation can now accurately control variables within its Sea Simulator laboratory. 

Control system engineering works have ensured treated wastewater will safely supply southern homes...  

Goulburn Murray’s water use has been optimised with a new irrigation, SCADA and telemetry system…

A wastewater plant has seen reduced energy costs and optimisation thanks to a much needed SCADA upgrade...
An RTU upgrade has increased South Australia’s water asset security with a highly secure data network and monitoring…
This energy monitoring solution gave The Advertiser the ability to better manage and limit energy expenditure across…

Melbourne-based City West Water’s telemetry upgrade had great results – improved water security, data access and...

Talk to us about...